制造科学与技术

人工髋关节股骨柄专用型疲劳测试装置研制

  • 华子恺 ,
  • 张欢欢 ,
  • 韦庆玥 ,
  • 范永威 ,
  • 潘绍斌
展开
  • 上海大学机电工程与自动化学院  上海  200072

收稿日期: 2015-02-27

  修回日期: 2015-09-27

  网络出版日期: 2016-01-05

基金资助

国家自然科学基金(51205241)和教育部博士点基金(20123108120008)资助项目

Development a Novel Fatigue Testing Apparatus for Artificial Hip Joint Femur Stem

  • HUA Zikai ,
  • ZHANG Huanhuan ,
  • WEI Qingyue ,
  • FAN Yongwei ,
  • PAN Shaobin
Expand
  • School of Mechatronics Engineering and Automation, Shanghai University, Shanghai 200072

Received date: 2015-02-27

  Revised date: 2015-09-27

  Online published: 2016-01-05

摘要

疲劳性能是人工关节等外科植入物可靠性的关键指标。针对人工髋关节疲劳性能测试问题,开发了专用型人工关节疲劳测试装置,基于装置,根据ISO7206标准,针对人工股骨柄产品进行了体外疲劳试验,并通过三坐标仪对试样进行变形测量与三维重构;此外,对试样中人工股骨柄进行有限元计算,模拟结果与试验所得变形量相吻合;经500万次循环疲劳试验后,该装置运行平稳、无异常,达到设计可靠性标准,能够有效进行人工髋关节疲劳标准测试与评估。

本文引用格式

华子恺 , 张欢欢 , 韦庆玥 , 范永威 , 潘绍斌 . 人工髋关节股骨柄专用型疲劳测试装置研制[J]. 机械工程学报, 2016 , 52(1) : 160 -164 . DOI: 10.3901/JME.2016.01.160

Abstract

Fatigue is a key factor of the reliability of orthopaedic implants, i.e. artificial joints. In this study, a new apparatus for the fatigue testing of artificial hip joints is developed. Via this apparatus, validation tests are performed on the stemmed femoral component according to the ISO7206 standard. And through coordinate measuring machine (CMM), the deformation of the specimen is measured during the procedure. Meanwhile, the 3D virtual prototype was reestablished. Moreover, finite element analysis (FEM) is performed and the results agreed well with the test results. After 5 millions running cycles, the apparatus ran smoothly and uneventfully, which reached the original design requirements. By using this apparatus, an effective testing method for the fatigue evaluation of artificial hip joints can be achieved.

参考文献

[1] HEIDI L P,MAJA B,URS P W. Hip stem fatigue test prediction[J]. International Journal of Fatigue,2009,31(5):894-905.
 [2] WOOLSON S T,MILBAUER J P,BOBYN J D,et al. Fatigue fracture of a forged cobalt- chromium-molybdenum femoral component inserted with cement[J]. Journal of Bone and Joint Surgery,1997,79 (12):1842-1848.
 [3] ILARIA C,GIANLUCA N,UGO A,et al. Biomedical imaging and computational modeling in biomechanics[M]. Berlin:Springer,2013.
 [4] 靳忠民,连芩,王臻,等. 双动人工半膝关节假体的设计及应用[J]. 机械工程学报,2013,49(6):12-19.JIN Zhongmin,LIAN Qin,WANG Zhen,et al. Custom-made bipolar hemi-knee prosthesis design and clinical application[J]. Journal of Mechanical Engineering,2013,49(6):12-19.
 [5] International Organization for Standardization. ISO 7206-4.Implants for surgery:Partial and total hip prostheses–Part 4:Determination of endurance properties and performance of stemmed femoral components[S]. Geneva:International Organization for Standardization,2010.
 [6] American Society for Testing and Materials. F1440-92.standard practice for cyclic fatigue testing of  metallic stemmed hip arthroplasty femoral components without torsion[S]. Philadelphia:American Society for Testing and Materials,2002.
 [7] GIZCOMOZZI C,ANDREAUS U,ROGANTE M,et al. Fatigue behavior of artificial femoral stems:The role of regulations and FE analysis[C]//The National Congress of Italian Group of Bioengineering,Roma,2012,81-108.
 [8] MAHMUT P,HASAN Y. Comparison of fatigue behaviour of eight different hip stems:A numerical and experimental study[J]. Journal Biomedical Science and Engineering,2011,4(10):643-650.
 [9] KADI M,BOULAHIA R,AZOUAOUI K,et al. Mechanical behavior simulation of hip prostheses stress distributions analysis[C]//16th European Conference of Fracture,Alexandroupolis,Democritus University of Thrace,2006,419-420.
[10] CHAO J. Is 7206 ISO standard enough to prove the endurance of femoral components of hip prostheses? [J]. Engineering Failure Analysis,2008,15(1):83-89.
[11] CHAO J,LO’PEZ V. Failure analysis of a Ti6Al4V cementless HIP prosthesis[J]. Engineering Failure Analysis,2007,14(5):822-830.
[12] GRIZA S,KWIETNIEWSKI C,TARNOWSKI G,et al. Fatigue failure analysis of a specific total hip prosthesis stem design[J]. International Journal of Fatigue,2008,30(8):1325-1332.
[13] GRIZA S,REIS M,REBOH Y,et al. Failure analysis of uncemented total hip stem due to microstructure and neck stress riser[J]. Engineering Failure Analysis,2008,15(7):981-988.
[14] GRIZA S,ZANON G,SILVA E,et al. Design aspects involved in a cemented THA stem failure case[J]. Engineering Failure Analysis,2009,16(1):512-520.
文章导航

/