Geological Adaptaive Design Method and Application of TBM Cutterhead

  • CHENG Yongliang ,
  • ZHONG Jue ,
  • JI Zhiyong ,
  • MEI Yongbing
Expand
  • 1. College of Mechanical and Electrical, Central South University, Changsha 410083;
    2. China Railway Construction Heavy Industry Co., Changsha 410100

Received date: 2017-03-02

  Revised date: 2017-06-02

  Online published: 2018-01-05

Abstract

The cutterhead is the core component of the full-face rock tunnel boring machine (TBM). The geologic adaptability of the structure is the key factor in determining the TBM efficiency. The basic process of cutterhead design is formulated based on the actual needs of designing cutterhead in TBM manufacturing enterprises. The key parameters calculation models of cutter layout, opening, and cutterhead body design are established by combining geology parameters, cutterhead structure parameters and tunneling parameters. The TBM cutterhead design method is applied to some water supply project. The parameters of TBM cutter layout, the driving performance of the cutterhead, tunneling parameters and cutterhead structure parameters are designed geology-adaptively. The performance of the design program is simulated and analyzed. The research results show that the cutterhead design method can effectively achieve that the cutterhead structure, the cutter layout and the relevant tunneling parameters are designed geology-adaptively. The mechanical properties of the cutterhead is designed to meet the construction requirements. At present the cutterhead has tunnelled 12 km in the water supply project and work well.

Cite this article

CHENG Yongliang , ZHONG Jue , JI Zhiyong , MEI Yongbing . Geological Adaptaive Design Method and Application of TBM Cutterhead[J]. Journal of Mechanical Engineering, 2018 , 54(1) : 1 -9 . DOI: 10.3901/JME.2018.01.001

References

[1] ROSTAMI J. Hard rock TBM cutterhead modeling for design and performance prediction[J]. Geomechanics and Tunnelling,2008,21(1):18-28.
[2] ZHAO J,GONG Q M,EISENSTEN Z. Tunnelling through a frequently changing and mixed ground:A case history in Singapore[J]. Tunnelling and Underground Space Technology,2007,22(4):388-400.
[3] XIA Yimin,OUYANG Tao,ZHANG Xinming,et al. Mechanical model of breaking rock and force characteristic of disc cutter[J]. Journal of Central South University,2012,19(7):1846-1852.
[4] XIA Yimin,TANG Lu,JI Zhiyong,et al. Optimal design of structural parameters for shield cutterhead based on fuzzy mathematics and multi-objective genetic algorithm[J]. Journal of Central South University,2015,22(3):937-945.
[5] ACAROGLU O,OZDEMIR L,ASBURY B. A fuzzy logic model to predict specific energy requirement for TBM performance prediction[J]. Tunneling Underground Space Technology,2008,23(5):600-608.
[6] GONG Q M,ZHAO J,HEFNY A M. Numerical simulation of rock fragmentation process induced by two TBM cutters and cutter spacing optimization[J]. Tunnelling and Underground Space Technology,2006,21(3):263.
[7] 林赉贶,郭金成,夏毅敏,等. 全断面岩石掘进机边缘滚刀优化布置研究[J]. 现代隧道技术,2016,53(4):90-96. LIN Laikuang,GUO Jincheng,XIA Yimin,et al. Layout optimization of TBM gauge disc cutters[J]. Modern Tunelling Technology,2016,53(4):90-96.
[8] 刘志杰,史彦军,滕弘飞. 基于实例推理的全断面岩石隧道掘进机刀盘主参数设计方法[J]. 机械工程学报,2010,46(3):158-164. LIU Zhijie,SHI Yanjun,TENG Hongfei. Case-based reasoning approach for cutterhead principal parameter design of full face rock tunnel boring machine[J]. Journal of Mechanical Engineering,2010,46(3):158-164.
[9] 耿麒,魏正英,杜军,等. 基于灰关联分析的全断面岩石掘进机滚刀布局优化方法[J]. 机械工程学报,2014,50(21):45-53. GENG Qi,WEI Zhengying,DU Jun,et al. Cutter's layout optimization method of the full-face rock tunnel boring machine based on grey relational analysis[J]. Journal of Mechanical Engineering,2014,50(21):45-53.
[10] 苏鹏程,王宛山,霍军周,等. TBM的滚刀布置优化设计研究[J]. 东北大学学报,2010,31(6):877-881. SU Pengcheng,WANG Wanshan,HUO Junzhou,et al. Optimal layout design of cutters on tunnel boring machine[J]. Journal of Northeastern University,2010,31(6):877-881.
[11] 韩美东,蔡宗熙,曲传咏. 基于动力稳定性的全断面岩石隧道掘进机刀盘临界推进速度研究[J]. 机械工程学报,2014,50(21):10-16. HAN Meidong,CAI Zongxi,QU Chuanyong. Study on the critical driving speed of the tunnel boring machine cutterhead based on the dynamic stability[J]. Journal of Mechanical Engineering,2014,50(21):10-16.
[12] LIU Jianqin,REN Jiabao,GUO Wei. Thrust and torque characteristics based on a new cutter-head load model[J]. Chinese Journal of Mechanical Engineering,2015,28(04):1.
[13] 蒲毅,刘建琴,郭伟,等. 土压平衡盾构机刀盘刀具布置方法研究[J]. 机械工程学报,2011,47(15):161-168. PU Yi,LIU Jianqin,GUO Wei,et al. Research on cutting tool layout method of earth pressure balance shield[J]. Journal of Mechanical Engineering,2011,47(15):161-168.
[14] 郭伟,胡竟,王磊,等. 基于CFD的土压平衡盾构刀盘开口分布特征研究[J]. 机械工程学报,2012,48(17):144-151. GUO Wei,HU Jing,WANG Lei,et al. Study on the opening distribution characteristics of earth pressure balance shield cutter head based on CFD[J]. Journal of Mechanical Engineering,2012,48(17):144-151.
[15] 霍军周,杨静,孙伟,等. TBM刀盘支撑筋结构设计及静动态特性分析[J]. 哈尔滨工程大学学报,2014(7):883-888. HUO Junzhou,YANG Jing,SUN Wei,et al. Structure design and static/dynamic analysis of TBM cutterhead supporting ribs[J]. Journal of Harbin Engineering University,2014(7):883-888.
[16] 霍军周,史彦军,滕弘飞,等. 全断面岩石掘进机刀具布置设计方法[J]. 中国机械工程,2008,19(15):1832-1836. HUO Junzhou,SHI Yanjun,TENG Hongfei,et al. Cutter lay-out design of the full-face rock tunnel boring machine(TBM)[J]. China Mechanical Engineering,2008,19(15):1832-1836.
[17] 霍军周,孙伟,欧阳湘宇,等. 隧道掘进机刀群与盘体支撑筋耦合布置设计[J]. 机械工程学报,2014,50(21):23-30. HUO Junzhou,SUN Wei,OUYANG Xiangyu,et al. Coupling layout design of disc cutters group and cutterhead supporting structure[J]. Journal of Mechanical Engineering,2014,50(21):23-30.
[18] HUO J,SUN W,CHEN J,et al. Disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on different layout patterns[J]. Computers & Industrial Engineering,2011,61(4):1209-1225.
[19] ROSTAMI J. Design optimization,performance prediction and economic analysis of tunnel boring machines for the construction of proposed Yucca Mountain nuclear waste repository[D]. Colorado:Colorado School of Mines,1992.
[20] 王梦恕,李典璜,张镜剑,等. 岩石隧道掘进机(TBM)施工及工程实例[M]. 北京:中国铁道出版社,2004. WANG Mengshu,LI Dianhuang,ZHANG Jingjian,et al. Tunnel boring machine construction and engineering case[M]. Beijing:China Railway Publishing House,2004.
Outlines

/