Integrated Optimization of Preventive Maintenance and Flexible Job Shop Group Scheduling Based on an ABC-AN Algorithm

LIU Qiong, LIU Jiahao, LIU Jialiang

Journal of Mechanical Engineering ›› 2023, Vol. 59 ›› Issue (12) : 89-96.

PDF(227 KB)
PDF(227 KB)
Journal of Mechanical Engineering ›› 2023, Vol. 59 ›› Issue (12) : 89-96. DOI: 10.3901/JME.2023.12.089

Integrated Optimization of Preventive Maintenance and Flexible Job Shop Group Scheduling Based on an ABC-AN Algorithm

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2023, 59(12): 89-96 https://doi.org/10.3901/JME.2023.12.089

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(227 KB)

Accesses

Citation

Detail

Sections
Recommended

/