Energy-saving Oriented Multi-objective Shop Floor Scheduling for Mixed-line Production of Missile Components

WEI Xin, ZHANG Zequn, TANG Dunbing, YANG Changqi, JIN Yongqiao, QIN Wei

Journal of Mechanical Engineering ›› 2018, Vol. 54 ›› Issue (9) : 45-54.

PDF(360 KB)
PDF(360 KB)
Journal of Mechanical Engineering ›› 2018, Vol. 54 ›› Issue (9) : 45-54. DOI: 10.3901/JME.2018.09.045

Energy-saving Oriented Multi-objective Shop Floor Scheduling for Mixed-line Production of Missile Components

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2018, 54(9): 45-54 https://doi.org/10.3901/JME.2018.09.045

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(360 KB)

Accesses

Citation

Detail

Sections
Recommended

/