通过活动横梁铸件简化模型研究了冷铁、自然风冷和强制风冷对厚壁回转体大型铸钢件凝固时间和砂芯温度场的影响。砂芯采用强制风冷铸件凝固时间最短,而采用冷铁不能缩短铸件凝固时间。通过对比不同冷却条件砂芯的温度场发现无强制冷却砂芯和冷铁砂芯分别在13 h和12 h出现热饱和现象,随后砂芯中心到铸件的温度梯度转为负值,砂芯向铸件输送热量;而砂芯采用自然风冷和强制风冷时从砂芯中心到铸件建立了正的温度梯度,能有效吸收铸件凝固期间释放的热量而改善其冷却条件;强制风冷对流换热系数高,冷却作用明显。对活动横梁铸件原始工艺改进,砂芯采用强制风冷;模拟结果与原始工艺相比缩孔位置上移,表明冒口补缩能力增强;同时砂芯实测温度场与模拟温度场相吻合,验证了模拟结果的可行性,由于砂芯在高温热作用下的时间短,经改进工艺所生产的活动横梁铸件中心孔表面无机械粘砂。
孙治国
,
任英磊
,
向青春
,
张伟
,
杨桂星
,
邱克强
. 强制风冷在大型铸钢件砂芯上的应用[J]. 机械工程学报, 2017
, 53(22)
: 67
-73
.
DOI: 10.3901/JME.2017.22.067
The solidification time of the large steel casting with thick section and the temperature field of the sand core cooled by chill, natural air and forced air are studied by the simplified model of a movable crossbeam. The casting solidification time is the shortest when sand core are cooled by forced air, while chill cannot shorten solidification time of the casting. By comparing the temperature fields in different sand core cooling conditions we find that both the no cooling sand core and the sand core with chill appear to be thermal saturation when solidification times are 13 and 12 hrs, respectively. Furthermore the heat come from thermal saturation will be transferred to the casting due to negative temperature gradient from center of the sand core to the casting. However, when the sand core is cooled by natural air or forced air, A positive temperature gradient from center of the sand core to the casting can effectively be established and therefore the heat come from the release of casting solidification can be absorbed to improve its cooling condition because the higher of convective heat transfer coefficient of forced air cooling, the more obvious of the cooling effect on the casting. The original casting technique of the movable crossbeam is improved by adopting forced air cooling to the sand core. The simulation results show that the feeding ability of the riser is enhanced due to the effect of forced air cooling on the shrinkage defect in the riser departing away from the casting. Furthermore the monitoring temperature field is coincided with that obtained by simulation indicating that the simulation results are credible. No mechanical bonding is found between sand and the surface of the center hole of the movable crossbeam for the refined technique due to the reduced time of the sand core exposed in the high temperature.
[1] 聂小武. 铸钢件缩孔及缩松缺陷的消除[J]. 铸造,2007(1):57-59. NIE Xiaowu. Elimination the porosity and shrinkage of steel castings[J]. Foundry,2007(1):57-59.
[2] 杨磊,张旭鹏. 大型铸钢件粘砂机理及防粘砂措施的研究[J]. 中国铸造装备与技术,2013(2):21-23. YANG Lei,ZHANG Xupeng. Research on mechanism of sand burning of large steel castings and prevention measures[J]. China Foundry Machinery and Technology,2013(2):21-23.
[3] 马洪波,孙逊,曾卫东,等. 不锈钢机械粘砂判据研究[J]. 铸造,2010,59(9):908-916. MA Hongbo,SUN Xun,ZENG Weidong,et al. Study on metal penetration criterion of stainless steel casting[J]. Foundry,2010,59(9):908-916.
[4] BROOKS B E,BECKEMANN C,RICHARDS V L. Prediction of burn-on and penetration in steel casting using simulation[J]. International Journal of Cast Metals Research,2007,20(4):177-190.
[5] 李日,柳百成,李文珍. 从厚壁铸钢件链轮的品质攻关看顺序凝固中温度梯度的重要性[J]. 铸造技术,2002,23(5):279-281. LI Ri,LIU Baicheng,LI Wenzhen. The important of temperature gradient in designing foundry technology of steel casting with heavy wall thickness[J]. Foundry Technology,2002,23(5):279-281.
[6] 李弘英. 实用铸造应用技术与实践[M]. 北京:化学工业出版社,2016. LI Hongying. Practical casting technology and practice[M]. Beijing:Chemical Industry Press,2016.
[7] SINGH D,NAVANEETH V,LEE J. Developing a localized squeeze cooling technique for improved casting solidification[J]. International Journal of Metal Casting,2011(11):65-79.
[8] 薛祥,周彼德,张跃冰,等. H型钢坯水冷金属型铸造充型凝固过程数值模拟[J]. 铸造,2003,52(12):1182-1185. XUE Xiang,ZHOU Bide,ZHANG Yuebing,et al. Numerical simulation of mold filling and solidification process of an H-shape steel billet in water cooling permanent mold[J]. Foundry,2003,52(12):1182-1185.
[9] HSU F,CHEN P,LIN H. Boiling Phenomena of cooling in water in the permanent mold[J]. International Journal of Metal Casting,2015,9(2):31-40.
[10] 第一重型机器厂. 大型铸钢件生产[M]. 哈尔滨:黑龙江人民出版社,1979. China First Heavy Industries. Production of large steel casting[M]. Harbin:Heilongjiang People's Publishing House,1979.
[11] 周棣华. 基于试验的铸造用可控强制冷却系统论证[J]. 铸造技术,2013,34(6):738-740. ZHOU Dihua. Proof of controlled forced cooling system used in foundry based on experiments[J]. Foundry Technology,2013,34(6):738-740.
[12] 葛丰德,赵长义,马边防. 大型铸钢件强制冷却工艺参数的计算[J]. 铸造,1987(6):13-16. GE Fengde,ZHAO Changyi,MA Bianfang. Calculation of technology parameters of forced cooling for large steel casting[J]. Foundry,1987(6):13-16.
[13] 赵成志,宫景艳,杨晓慧,等. 大型铸件强制冷却的工艺设计[J]. 中国铸造装备与技术,2000(4):31-32. ZHAO Chengzhi,GONG Jingyan,YANG Xiaohui,et al. Structure of forced cooling system and design of its auxiliary device[J]. China Foundry Machinery and Technology,2000(4):31-32.
[14] 向青春,张伟,邱克强,等. 基于DOE的大型下架体铸钢件铸造工艺优化研究[J]. 机械工程学报,2017,53(6):88-93. XIANG Qingchun,ZHANG Wei,QIU Keqiang,et al. Casting process optimization for large lower frame body of heavy gyratory crusher based on DOE[J]. Journal of Mechanical Engineering,2017,53(6):180-188.
[15] 贺斌,李显达,胡平,等. 基于数值模拟和3D打印的热冲压模具随形水道设计制造研究[J]. 机械工程学报,2016,52(19):180-188. HE Bin,LI Xianda,HU Ping,et al. Investigation of design and manufacture in hot stamping tools with conformal cooling channels based on simulation and 3D-printing technology[J]. Journal of Mechanical Engineering,2016,52(19):180-188.
[16] 李弘英. 铸钢件的凝固和致密度的控制[M]. 北京:机械工业出版社,1985. LI Hongying. Steel solidification and compactness control[M]. Beijing:China Machine Press,1985.
[17] 杨世铭,陶文铨. 传热学[M]. 北京:高等教育出版社,2006. YANG Shiming,TAO Wenquan. Heat transfer[M]. Beijing:Higher Education Press,2006.