Optimization of Resource Scheduling for Overhaul of High-Safety Equipment

ZHANGFeng-li, GURui, ZHUFu-zu, WANGCheng-cheng, WANGJin-jiang

Manufacturing Automation ›› 2024, Vol. 46 ›› Issue (8) : 69-77.

PDF(1411 KB)
PDF(1411 KB)
Manufacturing Automation ›› 2024, Vol. 46 ›› Issue (8) : 69-77. DOI: 10.3969/j.issn.1009-0134.2024.08.010

Optimization of Resource Scheduling for Overhaul of High-Safety Equipment

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2024, 46(8): 69-77 https://doi.org/10.3969/j.issn.1009-0134.2024.08.010

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(1411 KB)

Accesses

Citation

Detail

Sections
Recommended

/