Selective Asynchronous Parallel Disassembly Sequence Planning Considering Indeterminate Degree of Disassembly#br#

Expand
  • 1.School of Mechanical and Electrical Engineering,Wuhan University of Technology,Wuhan,430070
    2.Hubei Digital Manufacturing Key Laboratory,Wuhan University of Technology,Wuhan,430070

Received date: 2020-04-01

  Online published: 2021-05-19

Abstract

In view of the facts that the selective disassembly planning method commonly used in the recycling of waste products which might not fully considered the regeneration benefits of all parts, a method of selective asynchronous parallel disassembly sequence planning with an indeterminate degree of disassembly was proposed. The connection relation and priority constraint relation among product parts were expressed by the disassembly hybrid diagram. Based on this, the minimum required set of parts to be searched in the reverse direction was taken as the lower limit of the disassembly set to obtain the set with different disassembly degrees. Then a mathematical model was established with the optimization goals of minimum disassembly time and maximum disassembly profit, and an improved biogeographic-based optimization algorithm was proposed for solution optimization. Combined with the characteristics of the disassembly sequence planning problem, a coding method was designed based on three-layer linked list, and a random topology structure was used to improve the global search ability and local search ability of the algorithm. Finally, a mechanical arm and a two-stage cylindrical bevel gear reducer were studied as instances to demonstrate the feasibly and efficiency of the method presented.

Cite this article

GUO Jun, WANG Zhendong, DU Baigang, LI Yibing, . Selective Asynchronous Parallel Disassembly Sequence Planning Considering Indeterminate Degree of Disassembly#br#[J]. China Mechanical Engineering, 2021 , 32(09) : 1080 -1090,1101 . DOI: 10.3969/j.issn.1004-132X.2021.09.009

References

[1]SMITH S, HUNG P Y. A Novel Selective Parallel Disassembly Planning Method for Green Design[J]. Journal of Engineering Design, 2015, 26(10/12):283-301.
[2]KIM H W, LEE D H. An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-dependent Set-ups in Parallel Disassembly Environment[J]. International Journal of Production Research, 2017,55(24):7317-7333.
[3]PISTOLESI F, LAZZERINI B. TeMA:a Tensorial Memetic Algorithm for Many-objective Parallel Disassembly Sequence Planning in Product Refurbishment[J]. IEEE Transactions on Industrial Informatics, 2019, 15(6):3743-3753.
[4]田永廷, 张秀芬, 徐劲芳, 等. 支持再制造的选择性并行拆卸序列规划方法[J].计算机辅助设计与图形学学报,2018,30(3):531-539.
TIAN Yongting, ZHANG Xiufen, XU Jinfang, et al. Selective Parallel Disassembly Sequence Planning Method for Remanufacturing[J]. Journal of Computer-Aided Design & Computer Graphics, 2018,30(3):531-539.
[5]REN Y, ZHANG C, ZHAO F, et al. An Asynchronous Parallel Disassembly Planning Based on Genetic Algorithm[J].European Journal of Operational Research, 2018, 269(2):647-660.
[6]邓明星, 陈方颖, 唐秋华, 等. 考虑多目标件的异步并行选择性拆卸序列[J].计算机集成制造系统,2020,26(7):1749-1755.
DENG Mingxing, CHEN Fangying, TANG Qiuhua, et al. Asynchronous Parallel Selective Disassembly Sequence Considering Muti-targets[J].Computer Integrated Manufacturing Systems,2020,26(7):1749-1755.
[7]杨得玉, 徐志刚, 朱建峰, 等. 考虑产品故障特征的目标选择性拆卸序列规划[J].哈尔滨工业大学学报,2019,51(7):160-170.
YANG Deyu, XU Zhigang, ZHU Jianfeng, et al. Objective Selective Disassembly Sequence Planning Considered Product Fault Features[J]. Journal of Harbin Institute of Technology, 2019,51(7):160-170.
[8]LUO Y, PENG Q, GU P. Integrated Multi-layer Representation and Ant Colony Search for Product Selective Disassembly Planning[J]. Computers in Industry, 2016, 75:13-26.
[9]GUO J, ZHONG J, LI Y, et al. A Hybrid Artificial Fish Swam Algorithm for Disassembly Sequence Planning Considering Setup Time[J]. Assembly Automation, 2019, 39(1):140-153.
[10]宋守许, 张文胜, 张雷. 基于改进人工蜂群算法的产品拆卸序列规划[J].中国机械工程, 2016,27(17):2384-2390.
SONG Shouxu, ZHANG Wensheng, ZHANG Lei. Product Disassembly Sequence Planning Based on Improved Artificial Bee Colony Algorithm[J]. China Mechanical Engineering,2016,27(17):2384-2390.
[11]焦庆龙, 徐达, 李闯. 基于花朵授粉算法的产品拆卸序列规划[J].计算机集成制造系统,2016,22(12):2791-2799.
JIAO Qinglong, XU Da, LI Chuang. Product Disassembly Sequence Planning Based on Flower Pollination Algorithm[J]. Computer Integrated Manufacturing Systems, 2016,22(12):2791-2799.
[12]SIMON D. Biogeography-based Optimization[J]. IEEE Transactions on Evolutionary Computation, 2009, 12(6):702-713.
[13]鲁宇明, 王彦超, 吴竹溪. 具有二重机制的生物地理优化算法及圆柱度误差评定研究[J].机械工程学报,2016,52(24):80-87.
LU Yuming, WANG Yanchao, WU Zhuxi. Cylindricity Error Evaluation Based on an Improved Biogeography-based Optimization Algorithm[J]. Journal of Mechanical Engineering, 2016,52(24):80-87.
[14]鲁建厦, 胡庆辉, 董巧英, 等. 面向云制造的混流混合车间调度问题[J].中国机械工程,2017,28(2):191-198.
LU Jiansha, HU Qinghui, DONG Qiaoying, et al. Cloud Manufacturing-oriented Mixed-model Hybrid Shop-scheduling Problem[J]. China Mechanical Engineering, 2017,28(2):191-198.
[15]TIAN G, REN Y, FENG Y, et al. Modeling and Planning for Dual-objective Selective Disassembly Using AND/OR Graph and Discrete Artificial Bee Colony[J]. IEEE Transactions on Industrial Informatics, 2018, 15(4):2456-2468.
[16]MENG K, LOU P, PENG X,et al. An Improved Co-evolutionary Algorithm for Green Manufacturing by Integration of Recovery Option Selection and Disassembly Planning for End-of-life Products[J]. International Journal of Production Research, 2016,54(18):5567-5593.
[17]朱卓悦, 徐志刚, 沈卫东, 等.基于遗传蝙蝠算法的选择性拆卸序列规划[J]. 浙江大学学报(工学版),2018, 52(11):83-90.
ZHU Zhuoyue, XU Zhigang, SHEN Weidong, et al. Selective-disassembly Sequence Planning Based on Genetic-bat Algorithm[J]. Journal of Zhejiang University (Engineering Science),2018,52(11):83-90.
[18]TORKASHVAND M, NADERI B, HOSSEINI S A. Modelling and Scheduling Multi-objective Flow Shop Problems with Interfering Jobs[J]. Applied Soft Computing,2017, 54:221-228.
[19]吴定会, 孔飞, 朱绍文, 等. 生物地理学算法求解柔性车间作业调度问题[J].计算机工程与应用,2015,51(22):206-213.
WU Dinghui, KONG Fei, ZHU Shaowen, et al. Biogeography-based Optimization Algorithm for Flexible Job-shop Scheduling Problems[J]. Computer Engineering and Applications, 2015,51(22):206-213.
[20]徐志丹, 莫宏伟. 多目标扰动生物地理学优化算法[J]. 控制与决策, 2014, 29(2):231-235.
XU Zhidan, MO Hongwei. Multi-objective Disturbance Biogeography-based Optimization Algorithm[J]. Control & Decision, 2014, 29(2):231-235.
[21]刘若辰, 李建霞, 刘静, 等. 动态多目标优化研究综述[J].计算机学报,2020,43(7):1246-1278.
LIU Ruochen, LI Jianxia, LIU Jing, et al. A Survey on Dynamic Multi-objective Optimization[J]. Chinese Journal of Computers,2020,43(7):1246-1278.
Outlines

/

〈 〉