Dynamic Resource Allocation of Manufacturing Network for Emergency Equipment

Expand
  • College of Mechanical Engineering,Zhejiang University of Technology,Hangzhou,310023

Received date: 2020-02-28

  Online published: 2021-04-20

Abstract

Emergency equipment manufacturing was of high variability and volatility. In order to stabilize the abandonment probability of waiting customers in the manufacturing network, a multi-echelon manufacturing service network was proposed, together with a dynamic resource allocation strategy for each node based on queueing theory. Based on various target levels of the manufacturing service network, a closed-formed approximation algorithm and a numerical method were proposed to dynamically configure the manufacturing resources in the separate nodes. In the numerical examples, the methods were validated in terms of the target performance and coordinated strategy. The methods may be applied to the design of manufacturing networks for emergency equipment, and also support the configuration for more complex manufacturing service network structures. 

Cite this article

PEI Zhi, DAI Xu, YUAN Yilun, YI Wenchao, CHEN Yong . Dynamic Resource Allocation of Manufacturing Network for Emergency Equipment[J]. China Mechanical Engineering, 2021 , 32(07) : 839 -848 . DOI: 10.3969/j.issn.1004-132X.2021.07.011

References

[1]程颖, 戚庆林, 陶飞. 新一代信息技术驱动的制造服务管理: 研究现状与展望[J]. 中国机械工程, 2018, 29(18):2177-2188. 
CHENG Ying, QI Qinglin, TAO Fei. New IT-driven Manufacturing Service Management:Research Status and Prospect[J]. China Mechanical Engineering, 2018, 29(18):2177-2188.
[2]DASAKLIS T K, PAPPIS C P, RAXHANIOTIS N P. Epidemics Control and Logistics Operations:a Review[J]. International Journal of Production Economics, 2012, 139(2).
[3]江平宇, 李普林, 苏婷. 新一代信息技术驱动的装备生产过程技术管理创新方法研究[J].中国机械工程, 2020, 31(2):127-134.
JIANG Pingyu, LI Pulin, SU Ting. Research on Technology Management Innovation Methods for Equipment Productions Driven by NGIT[J]. China Mechanical Engineering, 2020, 31(2):127-134.
[4]程颖, 陶飞, 张霖, 等.面向服务的制造系统中制造服务供需匹配研究综述与展望[J]. 计算机集成制造系统, 2015, 21(7):1930-1940.
CHENG Ying, TAO Fei, ZHANG Lin, et al. Supply-demand Matching of Manufacturing Service in Service-oriented Manufacturing Systems[J]. Computer Integrated Manufacturing Systems, 2015, 21(7):1930-1940.
[5]孙林岩, 李刚, 江志斌, 郑力, 何哲. 21世纪的先进制造模式——服务型制造[J]. 中国机械工程, 2007(19):2307-2312. 
SUN Linyan, LI Gang, JIANG Zhibin, ZHENG Li, HE Zhe. Service-embeded Manufacturing Advanced Manufacturing Paradigm in the 21 Century[J]. China Mechanical Engineering, 2007(19):2307-2312.
[6]张富强, 江平宇, 郭威. 服务型制造学术研究与工业应用综述[J]. 中国机械工程, 2018, 29(18):2144-2163. 
ZHANG Fuqiang, JIANG Pingyu, GUO Wei. Academic Research and Industrial Applications of Service-oriented Manufacturing[J]. China Mechanical Engineering, 2018, 29(18):2144-2163.
[7]李浩, 顾新建, 祁国宁, 等. 现代制造服务业的发展模式及中国的发展策略[J]. 中国机械工程, 2012, 23(7):798-809.
LI Hao, GU Xinjian, QI Guoning, et al. Research on Development Mode of Modern Manufacturing Services and Its Development Strategy in China[J]. China Mechanical Engineering, 2012, 23(7):798-809.
[8]单子丹, 邹映, 李雲竹. 基于云计算的服务型制造网络流程优化与决策模型[J]. 计算机集成制造系统, 2019,25(12):3139-3148.
SHAN Zidan, ZOU Ying, LI Yunzhu. Process Optimization and Decision-making model of Service-oriented Manufacturing Network Based[J]. Computer Integrated Manufacturing Systems, 2019,25(12):3139-3148.
[9]原毅军, 任焕焕, 张蒙蒙. 装备制造业的耦合网络分析及升级路径[J]. 科技进步与对策, 2012, 29(09):58-62.
YUAN Yijun, REN Huanhuan, ZHANG Mengmeng. Coupling Network Analysis and Upgrading Path for Equipment Manufacturing[J].Science & Technology Progress and Policy, 2012, 29(09):58-62.
[10]向峰, 黄圆圆, 左颖, 等. 面向服务水平等级协议的制造服务能效评估[J]. 中国机械工程, 2018, 29(20):2401-2407. 
XIANG Feng, HUANG Yuanyuan, ZUO Ying, et al. SLA Oriented Energy Efficiency Evaluation of Manufacturing Service[J]. China Mechanical Engineering, 2018, 29(20):2401-2407.
[11]WU K, MCGINNIS L. Performance Evaluation for General Queueing Networks in Manufacturing Systems:Characterizing the Trade-off between Queue Time and Utilization[J]. European Journal of Operational Research, 2012, 221(2):328-339.
[12]彭永涛, 罗建强, 许丹, 等. 考虑服务外包的产品服务供应链网络均衡决策[J]. 计算机集成制造系统, 2021, 27(1):260-269.
PENG Yongtao, LUO Jianqiang, XU Dan, et al. Equilibrium Decisions of Product Service Supply Chain Network Considering Service Outsourcing[J]. Computer Integrated Manufacturing Systems, 2021, 27(1):260-269.
[13]SCHONLEIN M, MAKUSCHEWITZ T, WIRTH F, et al. Measurement and Optimization of Robust Stability of Multiclass Queueing Networks:Applications in Dynamic Supply Chains[J]. European Journal of Operational Research, 2013, 229(1):179-189.
[14]Da Silva N C R, MORABITO R. Performance Evaluation and Capacity Planning in a Metallurgical Job-shop System Using Open Queueing Network Models[J]. International Journal of Production Research, 2009, 47(23):6589-6609.
[15]DARESTANI S A, HEMMATI M. Robust Optimization of a Bi-objective Closed-loop Supply Chain Network for Perishable Goods Considering Queue System[J]. Computers & Industrial Engineering, 2019, 136:277-292.
[16]KIM S H, WHITT W. Are Call Center and Hospital Arrivals Well Modeled by Nonhomogeneous Poisson Processes?[J]. Manufacturing & Service Operations Management, 2014, 16(3):464-480.
[17]沈磊, 郭钢, 董元发, 等.面向装备制造行业的云制造服务需求与资源响应模型[J].中国机械工程, 2014, 25(7):911-917.
SHEN Lei, GUO Gang, DONG Yuanfa, et al. Equipment Manufacturing Industry-oriented Respond Model of Cloud Manufacturing Service Requirements and Resources[J]. China Mechanical Engineering, 2014, 25(7):911-917.
[18]ASKIN R G, HANUMANTHA G J. Queueing Network Models for Analysis of Nonstationary Manufacturing Systems[J]. International Journal of Production Research 2017, 56(1/2):22-42.
[19]LEE C, LIU Xin, LIU Yunan, et al. Optimal Control of a Time-Varying Double-Ended Production Queueing Model [J/OL]. (2020-02-09).[2021-02-26].https:∥doi.org/10.1287/stsy.2019.0066.
[20]EICK S G, MASSEY W A, WHITT W. The Physics of the Mt/G/∞ Queue[J]. Operations Research, 1993, 41(4):731-742.
[21]LIU Y, WHITT W. Stabilizing Customer Abandonment in Many-server Queues with Time-varying Arrivals[J]. Operations Research, 2012, 60(6):1551-1564.
[22]LIU Y, WHITT W. Stabilizing Performance in a Service System with Time-varying Arrivals and Customer Feedback[J]. European Journal of Operational Research, 2017, 256(2):473-486.
[23]WHITT W. Engineering Solution of a Basic Call-center Model[J]. Management Science, 2005, 51(2):221-235.
Outlines

/

〈 〉