Multidisciplinary Design Optimization of High-speed Pantograph  Based on Collaborative Optimization Algorithm

  • ZHANG Jing1 ,
  • CHENG Feifei2 ,
  • SONG Baolin2 ,
  • LIU Zhigang2 ,
  • ZHANG Weihua3
Expand
  • 1. School of Mechanical Engineering, Southwest Jiaotong University, Chengdu, 610031
    2. National Rail Transit Electrification and Automation Engineering Technique Research Center, Southwest Jiaotong University, Chengdu, 611756
    3. State Key Laboratory of Traction Power, Southwest Jiaotong University, Chengdu, 610031

Received date: 2019-11-18

  Online published: 2021-02-27

Abstract

Considering the influences of interaction and coupling among various disciplines on the design optimization of pantographs, the design demands of different working properties were analyzed. The multidisciplinary design optimization was adopted to establish optimization models of the system and subsystems that include the kinematics, statics, dynamics and control. According to the coupling relationship of design parameters of different disciplines, the collaborative optimization method was adopted to obtain the overall design optimization results of high-speed pantograph. The three-dimensional model of the pantograph was established to verify the validity of the optimized results by ANSYS. The results show that the multidisciplinary collaborative design meets the design requirements of the system and subsystems, and obtain the overall optimal solutions of the pantograph, which enhances the performance of the pantograph, reduces the fluctuation of the contact forces and increases the current collection quality of the pantograph and catenary.

Cite this article

ZHANG Jing1 , CHENG Feifei2 , SONG Baolin2 , LIU Zhigang2 , ZHANG Weihua3 .

Multidisciplinary Design Optimization of High-speed Pantograph  Based on Collaborative Optimization Algorithm
[J]. China Mechanical Engineering, 2021 , 32(04) : 490 -498 . DOI: 10.3969/j.issn.1004-132X.2021.04.015

References

[1]吴积钦. 受电弓与接触网系统[M]. 成都:西南交通大学出版社,2010.
WU Jiqin. Pantograph and Contact Line System[M]. Chengdu: Southwest Jiaotong University Press, 2010.
[2]刘红娇,张卫华,梅桂明. 高速受电弓几何机构参数优化[J]. 铁道学报,2001,23(6):16-20.
LIU Hongjiao, ZHANG Weihua, MEI Guiming. Optimization of Geometric Parameters for High-speed Pantograph Mechanism[J]. Journal of the China railway Society, 2001, 23(6): 16-20.
[3]JIA F, XU F, ZHOU H, et al. Optimization and Simulation of the Operational Motion of a Pantograph: Uplift and Retraction[J]. Journal of Mechanical Science and Technology, 2017, 31(1): 41-52.
[4]张义民,高越,吕昊,等. DSA200受电弓可靠性及可靠性灵敏度分析[J]. 铁道工程学报,2016,33(9):99-103.
ZHANG Yimin, GAO Yue, LYU Hao, et al. Analysis of Reliability and Reliability Sensitivity of DSA200 Pantograph[J]. Journal of Railway Engineering Society, 2016, 33(9):99-103.
[5]王江文,梅桂明,李瑞平,等. 弓网相互作用时受电弓关键部件动载荷研究[J]. 铁道学报,2018,40(3):68-75.
WANG Jiangwen, MEI Guiming, LI Ruiping, et al. Dynamic Load Research of Key Components of Pantograph in Pantograph-catenary Interaction[J]. Journal of the China Railway Society, 2018,40(3): 68-75.
[6]LEE J, PARK T, OH H, et al. Analysis of Dynamic Interaction between Catenary and Pantograph with Experimental Verification and Performance Evaluation in New High-speed Line[J]. Vehicle System Dynamics, 2015, 53(8): 1117-1134.
[7]周宁,蔚超,邹欢,等.一种新的考虑接触角的弓网接触模型[J]. 振动与冲击,2019,38(2):265-270.
ZHOU Ning, YU Chao, ZOU Huan, et al. New Pantograph/Catenary Contact Model Considering the Influence of Contact Angle[J]. Journal of Vibration and Shock, 2019, 38(2): 265-270.
[8]KIM J W, Yu S N. Design Variable Optimization for Pantograph System of High-speed Train Using Robust Design Technique[J]. International Journal of Precision Engineering and Manufacturing, 2013, 14(2):267-273.
[9]姜静,刘志刚,宋洋. 考虑受电弓非线性的弓网动态特性仿真研究[J]. 计算机仿真,2015,32(2):170-174.
JIANG Jing, LIU Zhigang, SONG Yang. Simulation Study on Dynamic Behavior of Pantograph-catenary Considering the Nonlinear Characteristics of Pantograph[J]. Computer Simulation, 2015, 32(2): 170-174.
[10]SANCHEZREBOLLO C, JIMENEZOCTAVIO J R, CARNICERO A, et al. Active Control Strategy on a Catenary-pantograph Validated Model[J]. Vehicle System Dynamics, 2013, 51(4): 554-569.
[11]SONG Y, OUYANG H, LIU Z, et al. Active Control of Contact Force for High-speed Railway Pantograph-catenary Based on Multi-body Pantograph Model[J]. Mechanism and Machine Theory, 2017, 115(1): 35-59.
[12]PAPPALARDO C M, DE SIMONE M C , GUIDA D . Multibody Modeling and Nonlinear Control of the Pantograph/Catenary System[J]. Archive of Applied Mechanics, 2019, 89(8): 1589-1626.
[13]ZHANG J, LIU Z, SONG Y, et al. Study on Multidisciplinary Integrated Design of High-speed Pantograph Based on Parameters Design, Dynamics Analysis and Optimal Control[C]]//35th Chinese Control Conference. Chengdu, 2016: 10253-10257.
[14]罗钜,郭福水. 民用涡扇发动机总体多学科设计优化研究[J]. 中国机械工程,2019,30(15):1813-1820.
LUO Ju, GUO Fushui. Study on Multi-disciplinary Design Optimization on Civil Turbofan Engines[J]. China Mechanical Engineering, 2019,30(15): 1813-1820.
[15]KROO I, MANNING V. Collaborative Optimization: Status and Directions[C]]//8th Symposium on Multidisciplinary Analysis and Optimization. AIAA, 2000: 2000-4721.
[16]WANG W, LIANG Y, ZHANG W, et al. Effect of the Nonlinear Displacement-dependent Characteristics of a Hydraulic Damper on High-speed Rail Pantograph Dynamics[J]. Nonlinear Dynamics, 2019, 95(4): 3439-3464.
[17]PISANO A, USAI E. Contact Force Estimation and Regulation in Active Pantographs: an Algebraic Observability Approach[C]//46th IEEE Conference on Decision and Control. New Orleans: IEEE, 2007: 4341-4346.
Outlines

/

〈 〉