A Game-theory Based Optimization Approach for Job Scheduling in Virtual Manufacturing Networks

  • NIE Li ,
  • ZHANG Guohui ,
  • WANG Xiaogang ,
  • BAI Yuewei
Expand
  • 1. School of Intelligent Manufacturing and Control Engineering, Shanghai Second Polytechnic University, Shanghai, 201209;
    2. School of Management Science and Engineering, Zhengzhou Institute of Aeronautical Industry Management, Zhengzhou, 450015

Received date: 2018-05-02

  Online published: 2020-07-09

Abstract

A non-cooperative game model was put forward herein for job scheduling problems in virtual manufacturing networks, which transferred the problems into a game. The concept of D-minimum Nash equilibrium was proposed based on the analysis of the existence of ideal Nash equilibrium in game scheduling model. A Nash equilibrium solving method was proposed based on genetic algorithm in order to search the D-minimum Nash equilibrium of the game. In the genetic algorithm, a chromosome coding and decoding scheme and fitness function were designed according to the characteristics of job scheduling problems in virtual manufacturing networks. Efficiency of the proposed approach was validated on several benchmark instances.

Cite this article

NIE Li , ZHANG Guohui , WANG Xiaogang , BAI Yuewei . A Game-theory Based Optimization Approach for Job Scheduling in Virtual Manufacturing Networks[J]. China Mechanical Engineering, 2019 , 30(12) : 1492 -1497 . DOI: 10.3969/j.issn.1004-132X.2019.12.017

References

[1] 白俊杰. 虚拟单元制造车间的规划与调度关键技术研究[D]. 南京:南京航空航天大学, 2010. BAI Junjie. Research on the Key Technologies of Workshop Planning and Scheduling in Virtual Cellular Shop-floor[D]. Nanjing:Nanjing University of Aeronautics and Astronautics, 2010.
[2] TAYEB F B, BENATCHBA K, MESSIAID A. Game Theory-based Integration of Scheduling with Flexible and Periodic Maintenance Planning in the Permutation Flowshop Sequencing Problem[J]. Operational Research, 2018, 18(1):221-255.
[3] LI Xinyu, GAO Liang, LI Weidong. Application of Game Theory Based Hybrid Algorithm for Multi-objective Integrated Process Planning and Scheduling[J]. Expert Systems with Applications, 2012, 39(1):288-297.
[4] ZHOU G H, JIANG P Y, HUANG G Q. A Game-theory Approach for Job Scheduling in Networked Manufacturing[J]. International Journal of Advanced Manufacturing Technology, 2009, 41(9/10):972-985.
[5] 周光辉, 程元森, 肖忠东, 等. 服务型制造车间关键任务调度的Stackelberg博弈研究[J]. 中国机械工程, 2014, 25(3):341-345. ZHOU Guanghui, CHENG Yuansen, XIAO Zhongdong, et al. Stackelberg Game for Critical Job Scheduling in Service-oriented Manufacturing Plants[J]. China Mechanical Engineering, 2014, 25(3):341-345.
[6] 周光辉, 程元森, 朱家凯. 面向SOMS外包任务分配决策的一对一Stackelberg博弈模型研究[J]. 应用科技, 2015, 42(2):53-57. ZHOU Guanghui, CHENG Yuansen, ZHU Jiakai. Research on the One-to-one Stackelberg Game Model Facing the Allocation Decision of SOMS Outsourcing Tasks[J]. Applied Science and Technology, 2015, 42(2):53-57.
[7] SUN Dihua, HE Wei, ZHENG Linjiang, et al. Scheduling Flexible Job Shop Problem Subject to Machine Breakdown with Game Theory[J]. International Journal of Production Research, 2013, 52(13):3858-3876.
[8] ZHANG Yingfeng, WANG Jin, LIU Sichao, et al. Game Theory Based Real-time Shop Floor Scheduling Strategy and Method for Cloud Manufacturing[J]. International Journal of Intelligent Systems, 2017, 32(4):437-463.
[9] FATTAHI P, MEHRABAD M S, JOLAI F. Mathematical Modeling and Heuristic Approaches to Flexible Job Shop Scheduling Problems[J]. Journal of Intelligent Manufacturing, 2007, 18(3):331-342.
Outlines

/

〈 〉