The coordinated optimization of time, economic and energy consumption was realized by planning the green production scheduling. Considering the TOU price policy of the electricity, the energy cost models under different production conditions were established based on the flexible job shop. Incorporating the green production shops management requirements, such as carbon emissions and order delivery, a green scheduling multi-objective optimization model was formulated to minimize carbon emissions, energy costs and makespan. In order to avoid the premature convergence of algorithm and maintain the diversity of population, the non-dominated sorting genetic algorithm-Ⅱ(NSGA-Ⅱ) with dynamic control parameter and improved elite retention strategy was proposed to solve this problem. Finally, the feasibility of the model and the superiority of the improved algorithm were verified by a real-world case.
[1] VANDYCK T, KERAMIDAS K, SAVEYN B, et al. A Global Stocktake of the Paris Pledges:Implications for Energy Systems and Economy[J]. Global Environmental Change, 2016, 41:46-63.
[2] ZHANG Y J, BIAN X J, TAN W P, et al.The Indirect Energy Consumption and CO2 Emission Caused by Household Consumption in China:an Analysis Based on the Input-output Method[J]. Journal of Cleaner Production, 2017, 163:69-83.
[3] 王凌, 王晶晶, 吴楚格. 绿色车间调度优化研究进展[J]. 控制与决策, 2018, 33(3):385-391. WANG Ling, WANG Jingjing, WU Chuge. Advances in Green Shop Scheduling and Optimization[J]. Control and Decision, 2018, 33(3):385-391.
[4] LI J Q, SANG H Y, HAN Y Y, et al. Efficient Multi-objective Optimization Algorithm for Hybrid Flow Shop Scheduling Problems with Setup Energy Consumptions[J]. Journal of Cleaner Production, 2018181:584-598.
[5] 钟祾充, 钱斌, 胡蓉, 等. 混合布谷鸟算法求解绿色流水车间调度问题[J].中国机械工程, 2018, 29(22):2674-2681. ZHONG Lingchong, QIAN Bin, HU Rong, et al. HCS Algorithm for Multi-objective Flow Shop Scheduling Problems with Energy Consumption[J]. China Mechanical Engineering, 2018, 29(22):2674-2681.
[6] LIU C G, YANG J, LIAN J, et al. Sustainable Performance Oriented Operational Decision-making of Single Machine Systems with Deterministic Product Arrival Time[J]. Journal of Cleaner Production, 2014, 85:318-330.
[7] 刘琼, 赵海飞. 基于多目标果蝇算法面向低碳的车间布局与调度集成优化[J].机械工程学报, 2017, 53(11):122-133. LIU Qiong, ZHAO Haifei. Integrated Optimization of Workshop Layout and Scheduling to Reduce Carbon Emissions Based on a Multi-objective Fruit Fly Optimization Algorithm[J]. Journal of Mechanical Engineering, 2017, 53(11):122-133.
[8] ZHANG R, CHIONG R. Solving the Energy-efficient Job Shop Scheduling Problem:a Multi-objective Genetic Algorithm with Enhanced Local Search for Minimizing the Total Weighted Tardiness and Total Energy Consumption[J]. Journal of Cleaner Production, 2016, 112:3361-3375.
[9] CHE A, WU X Q, PENG J, et al. Energy-efficient Bi-objective Single-machine Scheduling with Power-down Mechanism[J]. Computers & Operations Research, 2017, 85:172-183.
[10] CHE A, ZHANG S, WU X Q. Energy-conscious Unrelated Parallel Machine Scheduling under Time-of-use Electricity Tariffs[J]. Journal of Cleaner Production, 2017, 156:688-697.
[11] KIM S, MENG C, SON Y J. Simulation-based Machine Shop Operations Scheduling System for Energy Cost Reduction[J]. Simulation Modelling Practice and Theory, 2017, 77:68-83.
[12] ZHAO X C, BAI H, SHI Q, et al. Optimal Scheduling of a Byproduct Gas System in a Steel Plant Considering Time-of-use Electricity Pricing[J]. Applied Energy, 2017, 195:100-113.
[13] LUO H, DU B, HUANG G Q, et al. Hybrid Flow Shop Scheduling Considering Machine Electricity Consumption Cost[J]. International Journalof Production Economics, 2013, 146(2):423-439.
[14] GONG X, de PESSEMIER T, JOSEPH W, et al. An Energy-cost-aware Scheduling Methodology for Sustainable Manufacturing[J].Procedia CIRP, 2015, 29:185-190.
[15] 李小林, 张松, 陈华平. 考虑分时电价的多目标批调度问题蚁群算法求解[J].中国管理科学, 2014, 22(12):56-64. LI Xiaolin, ZHANG Song, CHEN Huaping. Solving Multi-objective Batch Scheduling under TOU Price Using Ant Colony Optimization[J]. Chinese Journal of Management Science, 2014, 22(12):56-64.
[16] SRINIVAS N, DEB K. Multiobjective Optimiza-tion Using Nondominated Sorting in Genetic Algorithms[J]. Evolutionary Computation, 1994, 2(3):221-248.
[17] GONG X, de PESSEMIER T, MARTENS L, et al. Energy- and Labor-aware Flexible Job Shop Scheduling under Dynamic Electricity Pricing:a Many-objective Optimization Investigation[J]. Journal of Cleaner Production, 2019, 209:1078-1094.
[18] 节约1度电减排多少CO2?[J].太阳能, 2010(12):64. How Much CO2 Will be Reduced by Saving One Kilowatt-hour Electricity?[J]. Solar Energy,2010(12):64.
[19] 蒋增强, 左乐. 低碳策略下的多目标柔性作业车间调度[J].计算机集成制造系统, 2015, 21(4):1023-1031. JIANG Zengqiang, ZUO Le. Multi-objective Flexible Job-shop Scheduling Based on Low-carbon Strategy[J]. Computer Integrated Manufacturing Systems, 2015, 21(4):1023-1031.
[20] WU X L, SUN Y J. A Green Scheduling Algorithm for Flexible Job Shop with Energy-saving Measures[J]. Journal of Cleaner Production, 2018, 172:3249-3264.
[21] WANG H F, FU Y P, HUANG M, et al. A NSGA-Ⅱ Based Memetic Algorithm for Multiobjective Parallel Flowshop Scheduling Problem[J]. Computers & Industrial Engineering, 2017, 113:185-194.
[22] MASHWANI W K, SALHI A, YENIAY O, et al. Hybrid Non-dominated Sorting Genetic Algorithm with Adaptive Operators Selection[J]. Applied Soft Computing, 2017, 56:1-18.
[23] 田启华, 明文豪, 文小勇, 等. 基于NSGA-Ⅱ的产品开发任务调度多目标优化[J].中国机械工程, 2018, 29(22):2758-2766. TIAN Qihua,MING Wenhao,WEN Xiaoyong, et al. Multi-objective Optimization Method of Product Development Task Scheduling Based on NSGA-Ⅱ[J]. China Mechanical Engineering, 2018,29(22):2758-2766.