For the flexible job shop-scheduling problem with AGVs, a hybrid genetic algorithm was proposed based on the time window and Dijkstra algorithm. Firstly, a mathematical model of the dual resource scheduling of AGV/machine was established. Secondly, three solutions were used to deal with conflicts and collisions in multiple AGV path planning. Then in order to take integrated scheduling of machine and AGVs into account, three encoding chain structures and the crossover and mutation operators of AGV coding chain were designed. Meanwhile, the Dijkstra algorithm was combined with the time window principles in the decoding operations of genetic algorithm, which may accurately plan a shortest path without collisions and conflicts for the taskes of AGVs. Finally, the feasibility, effectiveness and superiority of this algorithm were verified by numerical examples.
HE Changzheng
,
SONG Yuchuan
,
LEI Qi
,
LYU Xiangfei
,
LIU Ruanxiang
,
CHEN Jin
. Integrated Scheduling of Multiple AGVs and Machines in Flexible Job Shops[J]. China Mechanical Engineering, 2019
, 30(4)
: 438
-447
.
DOI: 10.3969/j.issn.1004-132X.2019.04.009
[1] 李岩,吴智铭,甘泉.柔性加工环境中机器和AGV的集成调度[J].中国机械工程, 2001, 12(4):447-450. LI Yan, WU Zhiming, GAN Quan. Integrated Scheduling of Machines and AGVS in Flexible Manufacturing Environment[J].China Mechanical Engineering, 2001, 12(4):447-450.
[2] 柳赛男,柯映林.一种解决有AGV小车约束的车间智能调度问题的算法[J].中国机械工程, 2007, 18(15):1810-1813. LIU Sainan, KE Yinglin. An Algorithm for Job Shop Scheduling in Dual Resource Constrained with AGV[J].China Mechanical Engineering,2007,18(15):1810-1813.
[3] ULUSOY G, BILGE V. Simultaneous Scheduling of Machines and Automated Guided Vehicles[J]. International Journal of Production Research, 1993, 31(12):2857-2873.
[4] VMIT B, ULUSOY G. Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS[J]. Operations Research, 1995, 43(6):1058-1070.
[5] ULUSOY G, SIVRIKAYA-SERIFOGLU F, VMIT B. A Genetic Algorithm Approach to the Simultaneous Scheduling of Machines and Automated Guided Vehicles[J]. Computers&Operations Research, 1997, 24(4):335-351.
[6] ABDELMAGUID T F, NASSEF A O, KAMAL B A, et al. A Hybrid GA/Heuristic Approach to the Simultaneous Scheduling of Machines and Automated Guided Vehicles[J]. International Journal of Production Research, 2004, 42(2):267-281.
[7] ZENG C, TANG J. Blocking Job Shop Cell Scheduling with Automated Guided Vehicles[C]//Intelligent Control and Automation. Shenyang,2015:438-442.
[8] REDDY B S P, RAO C S P. A Hybrid Multi-objective GA for Simultaneous Scheduling of Machines and AGVs in FMS[J]. The International Journal of Advanced Manufacturing Technology, 2006, 31(5):602-613.
[9] 肖海宁,楼佩煌,严伟国,等.柔性作业车间中机床与自动导引车在线调度方法[J].农业机械学报, 2013, 44(4):280-286. XIAO Haining, LOU Peihuang, YAN Weiguo, et al. On-line Scheduling Method for Simultaneous Scheduling of Machines and Automated Guide Vehicles in Flexible Job Shop[J]. Transactions of the Chinese Society for Agricultural Machinery, 2013, 44(4):280-286.
[10] 刘旭,楼佩煌,钱晓明,等.基于改进遗传算法的物料配送多AGV调度优化[J].机械设计与制造工程, 2015(3):16-21. LIU Xu, LOU Peihuang, QIAN Xiaoming, et al. Multi AGV Scheduling Optimization of Material Distribution Based on Improved Genetic Algorithm[J]. Mechanical Design and Manufacturing Engineering, 2015(3):16-21.
[11] 赵倩.生产物流系统规划分析与生产调度技术的研究现状与趋势[J].科技创新导报, 2008(9):63-64. ZHAO Qian. Research Status and Trends of Production Logistics System Planning Analysis and Production Scheduling Technology[J]. Science and Technology Innovation Herald, 2008(9):63-64.
[12] 刘国栋,曲道奎,张雷.多AGV调度系统中的两阶段动态路径规划[J].机器人, 2005, 27(3):210-214. LIU Guodong, QU Daokui, ZHANG Lei. Two-stage Dynamic Path Planning for Multiple AGV Scheduling Systems[J]. Robot, 2005, 27(3):210-214.
[13] 贺丽娜,楼佩煌,钱晓明,等.基于时间窗的自动导引车无碰撞路径规划[J].计算机集成制造系统, 2010, 16(12):2630-2634. HE Lina, LOU Peihuang, QIAN Xiaoming, et al. Conflict-free Automated Guide Vehicles Routing Based on Time Window[J].Computer Integrated Manufacture System,2010,16(12):2630-2634.
[14] 胡彬,王冰,王春香,等.一种基于时间窗的自动导引车动态路径规划方法[J].上海交通大学学报, 2012, 46(6):967-971. HU Bin, WANG Bing, WANG Chunxiang, et al. Dynamic Routing of Automated Guided Vehicles Based on Time Window[J].Journal of Shanghai Jiaotong Univesity, 2012, 46(6):967-971.
[15] 孙奇. AGV系统路径规划技术研究[D].杭州:浙江大学, 2012. SUN Qi. Research on Path Planning Technology of AGV System[D].Hangzhou:Zhejiang University,2012.
[16] 冯海双. AGV自动运输系统调度及路径规划的研究[D].哈尔滨:哈尔滨工业大学, 2013. FENG Haishuang. Research on Scheduling and Path Planning of AGV Automatic Transportation System[D]. Harbin:Harbin Institute of Technology, 2013.
[17] 苏霞,李伟光. FMS中自动导引车路径规划[J].机械设计与制造, 2015(1):201-203. SU Xia, LI Weiguang. Path Planning of AGV in FMS[J]. Machinery Design and Manufacture, 2015(1):201-203.
[18] 刘维民. AGV路径规划与调度系统研究[D].广州:华南理工大学, 2016. LIU Weimin. Research on AGV Path Planning and Scheduling System[D]. Guangzhou:South China University of Technology, 2016.
[19] SAIDI-MEHRABAD M, DEHNAVI-ARANI S, EVAZABADIAN F, et al. An Ant Colony Algorithm (ACA) for Solving the New Integrated Model of Job Shop Scheduling and Conflict-free Routing of AGVS[J]. Computers&Industrial Engineering, 2015, 86(C):2-13.
[20] 张超勇,董星,王晓娟,等.基于改进非支配排序遗传算法的多日标柔性作业车间调度[J].机械工程学报,2010,46(11):156-164. ZHANG Chaoyong, DONG Xing,WANG Xiaojuan, et al. Improved NSGA Ⅱ for the Multi Objective Flexible Job Shop Scheduling Problem[J].Journal of Mechanical Engineering,2010,46(11):156-164.