To optimize the RGV scheduling under uncertainty environments,a kind of scheduling rule was proposed based on CCPP. Taking the RGV scheduling system in an intelligent workshop as research object,considering that the CNC machines might stop working due to a series of uncertainty factors such as tool replacement,machine faults,etc.,the scheduling rule was proposed to optimize the feeding sequence of RGV in real time based on CCPP.Additionally,the nearest rule was presented to verify the superiority of CCPP scheduling rule. Results demonstrate that the capacity of intelligent workshops may be improved effectively by conducting CCPP scheduling rule,and the walking distance of RGV is reduced.
[1] LEE S G,SOUZA R D,ONG E K. Simulation Modelling of a Narrow Aisle Automated Storage and Retrieval. System (AS/RS) Serviced by Rail-guided Vehicles[J]. Computers in Industry,1996,30(3):241-253.
[2] MALMBORG C J. Design Optimization Models for Storage and Retrieval Systems Using Rail GuidedVehicles[J]. Applied Mathematical Modelling,2003,7(12):929-941.
[3] DOTOLI M,FANTI M P. A Coloured Petri Net Model for Automated Storage and Retrieval Systems Serviced by Rail-guided Vehicles:a Control Perspective[J]. International Journal of Computer Integrated Manufacturing,2005,18(2/3):122-136.
[4] CHEN F F,HUANG J,CENTENO M A. Intelligent Scheduling and Control of Rail-guided Vehicles and Load/Unload Operations in a Flexible Manufacturing System[J]. Journal of Intelligent Manufacturing,1999,10(5):405-421.
[5] JAIGANESH V,DHILEEP K J,GIRIJADEVI J. Automated Guided Vehicle with Robotic Logistics System[J]. Procedia Engineering,2014,97:2011-2021.
[6] HU Wuhua,MAO Jianfeng,WEI Keji. Energy-efficient Rail Guided Vehicle Routing for Two-sided Loading/Unloading Automated Freight Handling System[J]. European Journal of Operational Research,2015,258(3):1-30.
[7] NEJAD M G,GVDEN H,VIZVÁRI B,et al. A Mathematical Model and Simulated Annealing Algorithm for Solving the Cyclic Scheduling Problem of a Flexible Robotic Cell[J]. Advances in Mechanical Engineering,2018,10(1):1-12.
[8] KOO P H,JANG J,SUH J. Vehicle Dispatching for Highly Loaded Semiconductor Production Considering Bottleneck Machines First[J]. International Journal of Flexible Manufacturing Systems,2005,17(1):23-38.
[9] GAO Liang,ZHANG Guohui,ZHANG Liping,et al. An Efficient Memetic Algorithm for Solving the Job Shop Scheduling Problem[J]. Computers and Industrial Engineering,2011,60(4):699-705.
[10] LI Xinyu,GAO Liang,WEN Xiaoyu. Application of an Efficient Modified Particle Swarm Optimization Algorithm for Process Planning[J]. International Journal of Advanced Manufacturing Technology,2013,67(5/8):1355-1369.
[11] NAGESWARARAO M,NARAYANARAO K,RANAGAJANARDHANA G. Simultaneous Scheduling of Machines and AGVs in Flexible Manufacturing System with Minimization of Tardiness Criterion[J]. Procedia Materials Science,2014,5(3):1492-1501.
[12] WANG Y,LIU J H. Chaotic Particle Swarm Optimization for Assembly Sequence Planning[J]. Robotics and Computer-Integrated Manufacturing,2010,26(2):212-222.
[13] XU Weihua,XIONG Jian,YAO Guozhong. Self-learning Genetic Algorithms for RGV Optimization Scheduling[J]. Advanced Materials Research,2012,562/564:1706-1711.
[14] UMAR U A,ARIFFIN M K A,ISMAIL N,et al. Hybrid Multiobjective Genetic Algorithms for Integrated Dynamic Scheduling and Routing of Jobs and Automated-guided Vehicle (AGV) in Flexible Manufacturing Systems (FMS) Environment[J]. International Journal of Advanced Manufacturing Technology,2015,81(9/12):2123-2141.
[15] FAUADI M H F B M,YAHAYA S H,MURATA T. Intelligent Combinatorial Auctions of Decentralized Task Assignment for AGV with Multiple Loading Capacity[J]. IEEJ Transactions on Electrical & Electronic Engineering,2013,8(4):371-379.
[16] CARIDÁV F,MORANDIN O,TUMA C C M. Approaches of Fuzzy Systems Applied to an AGV Dispatching System in a FMS[J]. International Journal of Advanced Manufacturing Technology,2015,79(1/4):615-625.
[17] YEH W C,LAI P J,LEE W C,et al. Parallel-machine Scheduling to Minimize Makespan with Fuzzy Processing Times and Learning Effects[J]. Information Sciences,2014,269(4):142-158.
[18] FAZLOLLAHTABAR H,MEHRABAD M S,BALAKRISHNAN J. Mathematical Optimization for Earliness/Tardiness Minimization in a Multiple Automated Guided Vehicle Manufacturing System Via Integrated Heuristic Algorithms[J]. Robotics and Autonomous Systems,2015,72(C):131-138.
[19] YILDIZ S,KARASAN O E,AKTURK M S. An Analysis of Cyclic Scheduling Problems in Robot Centered Cells[J]. Computers & Operations Research,2012; 39(6):1290-1299.
[20] FOUMANI M,GUNAWAN I,IBRAHIM Y. Scheduling Rotationally Arranged Robotic Cells Served by a Multi-function Robot[J]. International Journal of Production Research,2014,52(13):4037-4058.
[21] WU J H,QIN T D,CHEN J,et al. Complete Coverage Path Planning and Obstacle Avoidance Strategy of the Robot[J]. Advanced Materials Research,2012,756/759:497-503.
[22] RASHIDI H,TSANG E P K. A Complete and an Incomplete Algorithm for Automated Auided Vehicle Scheduling in Container Terminals[J]. Computers and Mathematics with Applications,2011,61(3):630-641.
[23] DAKULOVIC M,PETROVIC I. Complete Coverage Path Planning of Mobile Robots for Humanitarian Demining[J]. Industrial Robot,2012,39(5):484-493.
[24] JANCHIV A,BATSAIKHAN D,KIM B S,et al. Time-efficient and Complete Coverage Path Planning Based on Flow Networks for Multi Robots[J].International Journal of Control Automation & Systems,2013,11(2):369-376.
[25] 田春颖,刘瑜,冯申珅,等.基于栅格地图的移动机器人完全遍历算法:矩形分解法[J]. 机械工程学报,2004,40(10):56-61. TIAN Chunying,LIU Yu,FENG Shenkun,et al. The Rectangle Decomposition Method:a Complete Algorithm for Mobile Robot based on Raster Map[J]. Journal of Mechanical Engineering,2004,40(10):56-61.
[26] 张赤斌,王兴松. 基于蚁群算法的完全遍历路径规划研究[J].中国机械工程,2008,19(16):1945-1949. ZHANG Chibin,WANG Xingsong. The Research of Full Traversal Path Planning Based on Ant Colony Algorithm[J]. China Mechanical Engineering,2008,19(16):1945-1949.