Sustainability-based Multi-task Scheduling in Cloud Manufacturing

  • HE Wei ,
  • JIA Guozhu ,
  • KONG Jili ,
  • ZONG Hengshan
Expand
  • 1. School of Economics and Management, Beihang University, Beijing, 100191;
    2. Automation School, Beijing University of Posts and Telecommunications, Beijing, 100876;
    3. China Aerospace Academy of Systems Science and Engineering, Beijing, 100048

Received date: 2018-03-29

  Online published: 2018-09-21

Abstract

In order to improve the sustainability of the cloud manufacturing scheduling processes, a multi-task scheduling method was studied based on the sustainability of cloud manufacturing, and a cloudmanufacturing multi-task scheduling process and a sustainability framework were analyzed based on the service-oriented architecture theory.Considering economic, environmental and social factors, a multi-task scheduling model was constructed based on sustainability and an improved genetic algorithm was designed to effectively solve the problems of scheduling model solution.Through the comparison simulation experiments based on the sustainability scheduling model and the satisfaction-based scheduling model, the effects of sustainability on the multi-task scheduling effectiveness of cloud manufacturing was observed. The results show that from the perspective of overall system optimization, the sustainability based scheduling model may reduce environmental costs and equipment idleness without sacrificing customer satisfaction, and ensure the sustainable operations of the platform as a whole.

Cite this article

HE Wei , JIA Guozhu , KONG Jili , ZONG Hengshan . Sustainability-based Multi-task Scheduling in Cloud Manufacturing[J]. China Mechanical Engineering, 2018 , 29(18) : 2215 -2225 . DOI: 10.3969/j.issn.1004-132X.2018.18.007

References

[1] DING K, JIANG P, ZHENG M.Environmental and Economic Sustainability-aware Resource Service Scheduling for Industrial Product Service Systems[J]. Journal of Intelligent Manufacturing,2017,28(6):1303-1316.
[2] 李伯虎,张霖,任磊,等.再论云制造[J].计算机集成制造系统, 2011, 17(3):449-457. LIU Bohu,ZHANG Lin,REN Lei,et al. Further Discussion on Cloud Manufacturing[J]. Computer Integrated Manufacturing Systems,2011,17(3):449-457.
[3] 李伯虎,张霖,王时龙,等.云制造:面向服务的网络化制造新模式[J].计算机集成制造系统, 2010, 16(1):1-7. LI Bohu, ZHANG Lin, WANG Shilong, et al.Cloud Manufacturing:a New Service-oriented Networked Manufacturing Model[J].Computer Integrated Manufacturing Systems, 2010, 16(1):1-7.
[4] CHENG Y, TAO F, LIU Y, et al.Energy-aware Resource Service Scheduling Based on Utility Evaluation in Cloud Manufacturing System[J].Proceedings of the Institution of Mechanical Engineers Part B, Journal of Engineering Manufacture,2013, 227(12):1901-1915.
[5] CHENG Z, ZHAN D, ZHAO X, et al.Multitask Oriented Virtual Resource Integration and Optimal Scheduling in Cloud Manufacturing[J]. Journal of Applied Mathematics,2014:369350.
[6] LIU Y, XU X, ZHANG L, et al.An Extensible Model for Multitask-oriented Service Composition and Scheduling in Cloud Manufacturing[J]. Journal of Computing and Information Science in Engineering, 2016, 16:0410094SI.
[7] 赵金辉,王学慧,关文革,等.考虑主体心理的云制造服务双层规划选择[J].计算机应用研究,2018(2):1-7. ZHAO Jinhui,WANG Xuehui,GUAN Wenge,et al. Selection of Cloud Manufacturing Services Considering Psychology Based on Bi-level Programming[J]. Application Research of Computers, 2018(2):1-7.
[8] 赵道致,李锐.考虑主体心理预期的云制造资源双边匹配机制[J].控制与决策,2017, 32(5):871-878. ZHAO Daozhi, LI Rui.Two-sided Matching Mechanism with Agents'Expectation for Cloud Manufacturing Resource[J]. Control&Decision,2017,32(5):871-878.
[9] CHENG Y, TAO F, ZHAO D, et al. Modeling of Manufacturing Service Supply-demand Matching Hypernetwork in Service-oriented Manufacturing Systems[J].Robotics and Computer-Integrated Manufacturing,2017, 45(S1):59-72.
[10] LIU Y, XU X, ZHANG L, et al. Workload-based Multi-task Scheduling in Cloud Manufacturing[J]. Robotics and Computer-Integrated Manufacturing, 2017, 45(S1):3-20.
[11] LARTIGAU J, XU X, NIE L, et al.Cloud Manufacturing Service Composition Based on QoS with Geo-perspective Transportation Using an Improved Artificial Bee Colony Optimisation Algorithm[J]. International Journal of Production Research, 2015, 53(14):4380-4404.
[12] SHEN X,YAO X. Mathematical Modeling and Multi-objective Evolutionary Algorithms Applied to Dynamic Flexible Job Shop Scheduling Problems[J].Information Sciences, 2015, 298:198-224.
Outlines

/

〈 〉