考虑物料约束的飞机总装调度
余志强, 谢敏, 况林, 王攀, 葛志兵
Aircraft Assembly Scheduling Problem Considering Material Arrival Time Constraints
YUZhi-qiang, XIEMin, KUANGLin, WANGPan, GEZhi-bing
制造业自动化 . 2024, (8): 149 -154 .  DOI: 10.3969/j.issn.1009-0134.2024.08.021